
Commercial flooring contractor for general contractors
Phase plan, submittals and closeout.
ValuFlor's commercial division carries a GC-run project from estimating and negotiation through material procurement, phased installation and closeout documentation.
- Scope
- Estimating, material procurement, phased installation, closeout documentation
- Submittals
- Product data, samples, moisture-mitigation approach
- Closeout
- Warranties, attic stock, maintenance instructions, as-installed documentation
- Reference
- The Whiting-Turner Contracting Company, on request
Estimating, submittals, phased installation, closeout, attic stock and as-installed documentation.
From the bid set to the closeout package.
Estimating and negotiation, material procurement, phased installation and closeout documentation, carried by the commercial division. In metro Atlanta and north Georgia, commercial work runs out of our Atlanta branch.
-
Estimating and bid support
Quantity takeoff from your drawings, alternates priced separately, value-engineering options put in writing rather than sprung at buyout.
-
Submittals and specs
Product data, samples and moisture-mitigation approach submitted to the architect's schedule, with substitutions documented against the spec section.
-
Phased installation
Floors sequenced to the phase plan and the other trades in the building.
-
Closeout package
Warranties, attic stock, maintenance instructions and as-installed documentation delivered as a package, not chased after substantial completion.
The paperwork comes with the floor.
Product data, samples and moisture-mitigation approach on the way in. Warranties, attic stock, maintenance instructions and as-installed documentation on the way out.
- Warranties
- Attic stock
- Maintenance instructions
- As-installed documentation
- Product data
- Samples
- Moisture-mitigation approach
What the GC says.
In Whiting-Turner's brief experience with ValuFlor to date, it has become evident that they truly care about their work. They strive to bring value to the job and the relationships with all parties involved. They express a partnership mentality in problem-solving from the executive management perspective as well as from experienced tradespeople. ValuFlor maintains consistent communication with the project team and is open to learning new administrative and quality control processes.
Questions general contractors ask.
What do you need to bid?
The project, the flooring square footage, the bid date and the drawings. Quantities are taken off your drawings, alternates are priced separately and value-engineering options are put in writing.
What goes in submittals?
Product data, samples and the moisture-mitigation approach, submitted to the architect's schedule.
What is in the closeout package?
Warranties, attic stock, maintenance instructions and as-installed documentation.
Can you phase the install?
Yes. Floors are sequenced to the phase plan and the other trades in the building.
Can I get a general contractor reference?
Yes. The Whiting-Turner Contracting Company, on request.
- Estimating
- Takeoff from your drawings
- Submittals
- To the architect's schedule
- Installation
- Sequenced to the phase plan
- Closeout
- Delivered as a package
Send the project, the square footage and the bid date.
Or call (864) 286-8782